Sunday At Wally Walls
And On The 7th Day, We Strapped Panels
Putting the finishing touches on tomorrow’s shipment of 2nd Floor Panels to a job site on the North Side of Chicago. Blessed today to have a committed team in place to ensure success. A shipment is the culmination of great engineering, detailed panelization drawings, specialized material ordering, outstanding carpentry, dedicated production workers, unparalleled production supervision, strong back-end staffing and awesome clientele. We are thankful everyday.
Who are you building with?
Build Better. Build With Wally!
Better. Better. Better.